Clubhouse steel stair, ladders and canopy
Rocklin, CA2026
Design engineer: stamped calculations for a deferred submittal
Exterior steel stair, pit and roof-hatch ladders, a hoist beam, and canopy framing for a new apartment clubhouse, documented in a 68-page calculation package.
- Codes
- CBC 2019 · AISC 360-16 · ASCE 7-16
- Outcome
- Accepted by the building’s engineer of record and carried through two rounds of third-party plan check; steel erected.
Automated slide gates and egress gates
Citrus Heights, CA2026In review
Design engineer: gate and fence plans and structural calculations
Two 22-foot automated slide gates, seven pedestrian gates, and a perimeter fence at an existing 1973 apartment community, with an exit analysis and a five-size footing schedule.
- Codes
- CBC 2025 · ASCE 7-22 · ASTM F2200
- Outcome
- Resubmittal answering city and fire-district plan-check comments, October 2026.
Guardrails, handrails and pool barriers
Sacramento, CA2026
Design engineer: stamped calculations for a deferred submittal
Stair and balcony guardrails, handrails, a laminated-glass ramp guard, pool barriers, and fencing for a large apartment community.
- Codes
- CBC 2022 · ASCE 7-22 · ASTM E1300
- Outcome
- City structural and life-safety comments answered in the second plan-check cycle.
Rooftop HVAC seismic and wind anchorage
Sacramento, CA2026In review
Design engineer: stamped anchorage calculations and details
Anchorage of a replacement rooftop packaged unit to the existing curb and roof framing, with steel-curb and wood-curb options, in an 11-page calculation package and four detail sheets.
- Codes
- CBC 2025 · CEBC 2025 · ASCE 7-22 · AISI S100 · NDS 2024
- Outcome
- Stamped package issued October 2026 in response to a city plan-check comment.
Resident EV charging stations
Folsom, CA2025
Civil engineer of record: site plans, coordinated with the electrical engineer
Seven charging stalls at an existing apartment community, including charger foundations, walk grades, and an accessibility exemption request under CBC 11B-228.3.2.
- Codes
- CBC 2022 · CEC 2022
- Outcome
- Approved by the City of Folsom; chargers built.
Church site improvement plans
Sacramento County, CA2026
Civil engineer of record
Re-approval of expired improvement plans: 15 civil sheets, an offsite 12-inch water main, and a state water-main separation waiver.
- Codes
- Sacramento County Improvement Standards · Title 22 §64572
- Outcome
- Approved by all reviewing County disciplines; declaration of covenants recorded.
Church site improvements through construction
North Highlands, CA2024–2026
Civil engineer of record, from plans through construction
Site improvement plans, sediment basin sizing, a hydrant flow analysis, and a retaining seat wall.
- Codes
- Sacramento County Improvement Standards
- Outcome
- Plans approved in 2024; under construction.
Parcel map drainage study
Elk Grove, CA2026In review
Drainage engineer: stamped study and plan-check response
Gravity detention for a six-acre, three-parcel map with about one foot of usable fall across the site.
- Codes
- Elk Grove Improvement Standards §9 · Sacramento Method
- Outcome
- Post-project peak flows 18–28% below existing without pumping; submitted October 2026.
14-lot single-family tentative map
Merced, CA2024
Civil engineer: tentative map and entitlement
Vesting tentative subdivision map for 14 single-family lots on 3.35 acres.
- Codes
- Subdivision Map Act
- Outcome
- Approved July 2024; extension granted to July 2028.